Generator electrical output connections

CONTROL SYSTEMS AND SWITCHGEAR

THE CONTROL LAYER BEHIND RELIABLE POWER

ATS panels, synchronising controls, bypass arrangements and BMS integration designed as part of one coordinated generator system.

24/7 SUPPORT

UK ENGINEERING

LONG-TERM SUPPORT

Generator electrical output connections

CONTROL SYSTEMS AND SWITCHGEAR

THE CONTROL LAYER BEHIND RELIABLE POWER

ATS panels, synchronising controls, bypass arrangements and BMS integration designed as part of one coordinated generator system.

24/7 SUPPORT

UK ENGINEERING

LONG-TERM SUPPORT

SWITCHGEAR QUESTIONS

SWITCHGEAR QUESTIONS

CONTROL DECISIONS THAT BELONG IN THE PROJECT BRIEF

CONTROL DECISIONS THAT BELONG IN THE PROJECT BRIEF

CONTROL DECISIONS THAT BELONG IN THE PROJECT BRIEF

Discuss changeover time, operating sequence and integration before equipment is ordered.

Discuss changeover time, operating sequence and integration before equipment is ordered.

Lance Power generator prepared for specialist delivery

01

01

DOES AN ATS PROVIDE UNINTERRUPTED POWER?

DOES AN ATS PROVIDE UNINTERRUPTED POWER?

No. An ATS transfers between sources, but a generator must start and reach operating conditions before it can accept load.

No. An ATS transfers between sources, but a generator must start and reach operating conditions before it can accept load.

02

02

CAN MULTIPLE GENERATORS OPERATE TOGETHER?

CAN MULTIPLE GENERATORS OPERATE TOGETHER?

Yes, with a properly designed synchronisation and control system matched to the electrical design and operating requirements.

Yes, with a properly designed synchronisation and control system matched to the electrical design and operating requirements.

Lance Power standby generator installed at an industrial facility

03

03

CAN THE PANEL CONNECT TO A BMS?

CAN THE PANEL CONNECT TO A BMS?

Yes. Confirm the required signals, protocol and responsibilities at design stage so integration is included in the agreed scope.

Yes. Confirm the required signals, protocol and responsibilities at design stage so integration is included in the agreed scope.

GENERATOR SWITCHGEAR • ATS PANELS • SYNCHRONISATION • BMS INTEGRATION • BYPASS CONTROLS • COMMISSIONING

CONTROL STRATEGY / 02

AGREE HOW THE POWER SYSTEM SHOULD RESPOND

AGREE HOW THE POWER SYSTEM SHOULD RESPOND

Define what should happen when the normal supply fails, which loads must transfer and how the site returns to normal operation.

Soundproof Lance Power generator and portable load equipment

AUTOMATIC CHANGEOVER

ATS PANELS FOR STANDBY GENERATION

An automatic transfer switch controls transfer between power sources. It does not by itself create uninterrupted power, so the permitted interruption and sequence must be agreed.

SYNCHRONISED SYSTEMS

Coordinate multiple generating sets and the electrical distribution around the intended operating sequence and load sharing strategy.

BMS AND REMOTE SIGNALS

Identify the statuses, alarms and commands required by the wider monitoring system at design stage.

Generator engine and alternator inside an acoustic enclosure

BYPASS AND MAINTENANCE

Consider maintenance bypass arrangements and safe access where operational continuity and servicing requirements demand them.

RELEVANT FAQS

RELEVANT FAQS

COMMON QUESTIONS, ANSWERED CLEARLY

COMMON QUESTIONS, ANSWERED CLEARLY

What does an Automatic Transfer Switch do?

What does an Automatic Transfer Switch do?

An ATS monitors the normal supply and transfers the connected load to the generator when defined failure conditions occur, then returns it when the normal supply is restored.

An ATS monitors the normal supply and transfers the connected load to the generator when defined failure conditions occur, then returns it when the normal supply is restored.

Can generators run in parallel?

Can generators run in parallel?

Yes. Synchronising controls can coordinate multiple generators and, where required, interface with the mains supply. The protection and operating philosophy must be defined carefully.

Yes. Synchronising controls can coordinate multiple generators and, where required, interface with the mains supply. The protection and operating philosophy must be defined carefully.

Can switchgear connect to a BMS?

Can switchgear connect to a BMS?

Yes. Status, alarms, metering and remote-control requirements can be coordinated with the building management or supervisory system.

Yes. Status, alarms, metering and remote-control requirements can be coordinated with the building management or supervisory system.