UK INDUSTRIAL GENERATOR MANUFACTURER

24/7 SERVICE SUPPORT • +44 333 222 4368 • info@lance-power.com

Lance Power generator arriving on a UK construction site

PROJECT DELIVERY CAPABILITIES

FROM SITE BRIEF TO A COMMISSIONED POWER SYSTEM

Coordinate generator specification, controls, logistics, installation, testing and handover with one accountable project team.

DISCUSS YOUR REQUIREMENTS ↗

Lance Power generator arriving on a UK construction site

PROJECT DELIVERY CAPABILITIES

FROM SITE BRIEF TO A COMMISSIONED POWER SYSTEM

Coordinate generator specification, controls, logistics, installation, testing and handover with one accountable project team.

DISCUSS YOUR REQUIREMENTS ↗

DEFINE BEFORE DELIVERY

DEFINE BEFORE DELIVERY

ENGINEERING DECISIONS BELONG AT THE START OF THE PROGRAMME

ENGINEERING DECISIONS BELONG AT THE START OF THE PROGRAMME

Operating duty, loads, access, positioning, maintenance clearances, fuel, acoustic constraints and controls should be resolved before equipment reaches site. Early coordination reduces late changes and gives every contractor a clearer scope.

Operating duty, loads, access, positioning, maintenance clearances, fuel, acoustic constraints and controls should be resolved before equipment reaches site. Early coordination reduces late changes and gives every contractor a clearer scope.

Generator being lifted into a constrained construction site

ONE COORDINATED PROCESS

ONE COORDINATED PROCESS

FOUR STAGES, ONE ACCOUNTABLE TEAM

FOUR STAGES, ONE ACCOUNTABLE TEAM

From initial consultation and site survey through to commissioning and handover, every stage is coordinated by one accountable project team.

From initial consultation and site survey through to commissioning and handover, every stage is coordinated by one accountable project team.

01

01

CONSULT & SURVEY

CONSULT & SURVEY

Clarify duty, site constraints, interfaces and responsibilities.

Clarify duty, site constraints, interfaces and responsibilities.

02

02

DESIGN & SPECIFY

DESIGN & SPECIFY

Select the set, enclosure, controls, fuel and connection strategy.

Select the set, enclosure, controls, fuel and connection strategy.

03

03

INSTALL & INTEGRATE

INSTALL & INTEGRATE

Coordinate logistics, positioning, mechanical and electrical work.

Coordinate logistics, positioning, mechanical and electrical work.

04

04

TEST & HAND OVER

TEST & HAND OVER

Commission the system, agree evidence, train operators and document handover.

Commission the system, agree evidence, train operators and document handover.

Lance Power generator prepared for specialist project delivery

COMMISSIONING & HANDOVER

COMMISSIONING & HANDOVER

TEST AGAINST THE INTENDED OPERATION

TEST AGAINST THE INTENDED OPERATION

Installation places and connects the equipment. Commissioning checks the generator, controls and changeover arrangement against the agreed operating requirements. Plan the sequence, attendance, load test and handover evidence before testing begins.

Installation places and connects the equipment. Commissioning checks the generator, controls and changeover arrangement against the agreed operating requirements. Plan the sequence, attendance, load test and handover evidence before testing begins.

PAGE-SPECIFIC FAQS

PAGE-SPECIFIC FAQS

USEFUL ANSWERS BEFORE YOU SPECIFY

USEFUL ANSWERS BEFORE YOU SPECIFY

These questions reflect the decisions most often raised for this product or service.

These questions reflect the decisions most often raised for this product or service.

Can you work from a consultant’s specification?

Can you work from a consultant’s specification?

Yes. Send the specification and drawings so the team can review the package, interfaces and agreed delivery scope.

Yes. Send the specification and drawings so the team can review the package, interfaces and agreed delivery scope.

Are installation and commissioning the same?

Are installation and commissioning the same?

No. Installation positions and connects the system. Commissioning checks its operation against the agreed requirements.

No. Installation positions and connects the system. Commissioning checks its operation against the agreed requirements.

Can operator training and documentation be included?

Can operator training and documentation be included?

Yes. Training and handover documentation can be included within the agreed turnkey project scope.

Yes. Training and handover documentation can be included within the agreed turnkey project scope.

SHARE YOUR DRAWINGS, PROGRAMME AND POWER REQUIREMENT

SHARE YOUR DRAWINGS, PROGRAMME AND POWER REQUIREMENT

START A CONVERSATION ↗