UK INDUSTRIAL GENERATOR MANUFACTURER

24/7 SERVICE SUPPORT • +44 333 222 4368 • info@lance-power.com

LPL100 PORTABLE LOAD BANK

100 KW OF CONTROLLED TESTING, READY TO MOVE

A compact industrial load bank for commissioning teams, service engineers and maintenance contractors who need accurate, repeatable testing without specialist lifting equipment.

DISCUSS YOUR REQUIREMENTS ↗

LPL100 PORTABLE LOAD BANK

100 KW OF CONTROLLED TESTING, READY TO MOVE

A compact industrial load bank for commissioning teams, service engineers and maintenance contractors who need accurate, repeatable testing without specialist lifting equipment.

DISCUSS YOUR REQUIREMENTS ↗

100 KW

100 KW

RESISTIVE LOAD

RESISTIVE LOAD

200 KW

200 KW

TWO UNITS COMBINED

TWO UNITS COMBINED

250 KVA

250 KVA

COMBINED TEST CAPACITY

COMBINED TEST CAPACITY

3 PHASE

3 PHASE

ELECTRICAL MEASUREMENT

ELECTRICAL MEASUREMENT

PORTABLE BY DESIGN

PORTABLE BY DESIGN

INDUSTRIAL PERFORMANCE WITHOUT THE LOGISTICS OVERHEAD

INDUSTRIAL PERFORMANCE WITHOUT THE LOGISTICS OVERHEAD

The protective carry case supports transport and storage between sites. Clear controls and adjustable load steps help operators apply a defined electrical demand during commissioning, preventative maintenance and fault investigation.

MEASURE AND MONITOR

✓ Three-phase voltage and current

✓ Active, reactive and apparent power

✓ Power factor and frequency

✓ Generator running time

✓ Stable-state generator and UPS testing

TEST WITH PURPOSE

TEST WITH PURPOSE

FROM CONNECTION TO USEFUL EVIDENCE

FROM CONNECTION TO USEFUL EVIDENCE

A load bank is most valuable when the duty, steps, duration, measurements and acceptance criteria are agreed before the test begins.

A load bank is most valuable when the duty, steps, duration, measurements and acceptance criteria are agreed before the test begins.

01

01

DEFINE

DEFINE

Agree what the test needs to demonstrate.

Agree what the test needs to demonstrate.

02

02

CONNECT

CONNECT

Confirm safe connection and site arrangements.

Confirm safe connection and site arrangements.

03

03

APPLY

APPLY

Increase load in controlled, recorded steps.

Increase load in controlled, recorded steps.

04

04

REVIEW

REVIEW

Compare readings with the agreed criteria.

Compare readings with the agreed criteria.

PAGE-SPECIFIC FAQS

PAGE-SPECIFIC FAQS

USEFUL ANSWERS BEFORE YOU SPECIFY

USEFUL ANSWERS BEFORE YOU SPECIFY

These questions reflect the decisions most often raised for this product or service.

These questions reflect the decisions most often raised for this product or service.

What systems can the LPL100 test?

What systems can the LPL100 test?

It supports controlled resistive testing of compatible generator and UPS systems within the unit’s electrical ratings and connection requirements.

It supports controlled resistive testing of compatible generator and UPS systems within the unit’s electrical ratings and connection requirements.

Can two LPL100 units work together?

Can two LPL100 units work together?

Yes. Two units can be synchronised for combined testing up to 200 kW or 250 kVA, subject to the planned test arrangement.

Yes. Two units can be synchronised for combined testing up to 200 kW or 250 kVA, subject to the planned test arrangement.

Does Lance Power also provide load bank testing as a service?

Does Lance Power also provide load bank testing as a service?

Yes. If you need a managed test rather than equipment supply, share the generator, site and required test outcome with the service team.

Yes. If you need a managed test rather than equipment supply, share the generator, site and required test outcome with the service team.

REQUEST THE LPL100 DATA SHEET OR DISCUSS A TEST

REQUEST THE LPL100 DATA SHEET OR DISCUSS A TEST

START A CONVERSATION ↗