LPL100 PORTABLE LOAD BANK
100 KW OF CONTROLLED TESTING, READY TO MOVE
A compact industrial load bank for commissioning teams, service engineers and maintenance contractors who need accurate, repeatable testing without specialist lifting equipment.
DISCUSS YOUR REQUIREMENTS ↗

LPL100 PORTABLE LOAD BANK
100 KW OF CONTROLLED TESTING, READY TO MOVE
A compact industrial load bank for commissioning teams, service engineers and maintenance contractors who need accurate, repeatable testing without specialist lifting equipment.
DISCUSS YOUR REQUIREMENTS ↗
100 KW
100 KW
RESISTIVE LOAD
RESISTIVE LOAD
200 KW
200 KW
TWO UNITS COMBINED
TWO UNITS COMBINED
250 KVA
250 KVA
COMBINED TEST CAPACITY
COMBINED TEST CAPACITY
3 PHASE
3 PHASE
ELECTRICAL MEASUREMENT
ELECTRICAL MEASUREMENT
PORTABLE BY DESIGN
PORTABLE BY DESIGN
INDUSTRIAL PERFORMANCE WITHOUT THE LOGISTICS OVERHEAD
INDUSTRIAL PERFORMANCE WITHOUT THE LOGISTICS OVERHEAD
The protective carry case supports transport and storage between sites. Clear controls and adjustable load steps help operators apply a defined electrical demand during commissioning, preventative maintenance and fault investigation.
MEASURE AND MONITOR
✓ Three-phase voltage and current
✓ Active, reactive and apparent power
✓ Power factor and frequency
✓ Generator running time
✓ Stable-state generator and UPS testing
TEST WITH PURPOSE
TEST WITH PURPOSE
FROM CONNECTION TO USEFUL EVIDENCE
FROM CONNECTION TO USEFUL EVIDENCE
A load bank is most valuable when the duty, steps, duration, measurements and acceptance criteria are agreed before the test begins.
A load bank is most valuable when the duty, steps, duration, measurements and acceptance criteria are agreed before the test begins.
01
01
DEFINE
DEFINE
Agree what the test needs to demonstrate.
Agree what the test needs to demonstrate.
02
02
CONNECT
CONNECT
Confirm safe connection and site arrangements.
Confirm safe connection and site arrangements.
03
03
APPLY
APPLY
Increase load in controlled, recorded steps.
Increase load in controlled, recorded steps.
04
04
REVIEW
REVIEW
Compare readings with the agreed criteria.
Compare readings with the agreed criteria.
PAGE-SPECIFIC FAQS
PAGE-SPECIFIC FAQS
USEFUL ANSWERS BEFORE YOU SPECIFY
USEFUL ANSWERS BEFORE YOU SPECIFY
These questions reflect the decisions most often raised for this product or service.
These questions reflect the decisions most often raised for this product or service.
What systems can the LPL100 test?
What systems can the LPL100 test?
It supports controlled resistive testing of compatible generator and UPS systems within the unit’s electrical ratings and connection requirements.
It supports controlled resistive testing of compatible generator and UPS systems within the unit’s electrical ratings and connection requirements.
Can two LPL100 units work together?
Can two LPL100 units work together?
Yes. Two units can be synchronised for combined testing up to 200 kW or 250 kVA, subject to the planned test arrangement.
Yes. Two units can be synchronised for combined testing up to 200 kW or 250 kVA, subject to the planned test arrangement.
Does Lance Power also provide load bank testing as a service?
Does Lance Power also provide load bank testing as a service?
Yes. If you need a managed test rather than equipment supply, share the generator, site and required test outcome with the service team.
Yes. If you need a managed test rather than equipment supply, share the generator, site and required test outcome with the service team.
REQUEST THE LPL100 DATA SHEET OR DISCUSS A TEST
REQUEST THE LPL100 DATA SHEET OR DISCUSS A TEST
START A CONVERSATION ↗